A loss of production can be very expensive- time is money! With our technical equipment we are able to perform re-boring of tube-bundles at short notice.
The appropriate heat-exchanger components (antechamber, liner, floating-heads) can be repaired or modified at short notice as well.
By example it is possible, to cut through tube-bundles up to 1.300mm diameter with only one notch.
|